کاترپیلار عسلویه

کاترپیلار عسلویه خرید آسان ارسال رایگان به سراسر کشور _ مشتریان گرامی جهت مشاهده مدلها لطفا به پیج اینستاگرام ما بپیوندید

کاترپیلار عسلویه


CAT 323DL

Caterpillar built its first Russian facility in the town of , located near . It was completed in 16 months, occupied in November 1999, and began fabricating machine components in 2000. It had the first electrical substation built in the  since the Communist government was dissolved on December 26, 1991. The facility was built under harsh winter conditions, where the temperature was below −۱۳ °F (−۲۵ °C). The facility construction was managed by the  located in .[]

The $125M Caterpillar Suzhou,  facility, manufactures medium wheel loaders and motorgraders, primarily for the Asian market. The first machine was scheduled for production in March 2009. URS Ausino, in San Francisco, California, manages facility construction.[]

کاترپیلار عسلویه

Caterpillar has manufactured in  since 1960. In 2010 the company announced plans to further expand production of  and small wheel loaders with a new factory.

Caterpillar has been manufacturing machines, engines and generator sets in India as well. Caterpillar has 3 facilities in India, which are in the states of Tamil Nadu (Thiruvallur & Hosur) and Maharastra (Aurangabad).

Acquisitions

In addition to increasing sales of its core products, much of Caterpillar’s growth has been through acquisitions, including

In addition to increasing sales of its core products, much of Caterpillar’s growth has been through acquisitions, including

In addition to increasing sales of its core products, much of Caterpillar’s growth has been through acquisitions, including

Caterpillar built its first Russian facility in the town of , located near . It was completed in 16 months, occupied in November 1999, and began fabricating machine components in 2000. It had the first electrical substation built in the  since the Communist government was dissolved on December 26, 1991. The facility was built under harsh winter conditions, where the temperature was below −۱۳ °F (−۲۵ °C). The facility construction was managed by the  located in .[]